mbe 128 Project
Kitchen installation in new home construction.
- Date: October 2018
- Project Type: Kitchen Installation
About this Project
- Stained cabinets
- 90″ refrigerator cabinet set up with 30″ side panel
- 36″ upper cabinets
- Corner carousel base cabinet
- Oil rubbed bronze hardware
- Soft close drawer and door hardware
- Color matching toe kicks
- 3″ stained crown molding
- Under cabinet lighting
Related Projects
mbe 138
- White wall cabinets with gray island
- 60″ butlers cabinet
- Farm sink with 3″ pilasters
- 42″ x 15″ corner cabinet
- 96″ refrigerator cabinet set up with wine rack
- 102″ custom island with curved top, raised panels and corbels
- Slide out shelves
- soft close hardware
- satin nickle hardware
- Color matching toe kicks
- 3″ white crown molding
mbe 127
- White wall cabinets with gray island
- 42″ upper cabinets
- Double 24″x 96″ pantry cabinets with roll out shelves
- 42″ upper corner cabinet with bi-fold door
- 96″ refrigerator cabinet set up with 24″ deep cabinet
- 123″ island with under mount sink
- Oil rubbed bronze hardware
- Color matching toe kicks
- 3″ white cove molding
- Soft close hardware
- Under cabinet lighting
- Glass tile back splash